Skip to main content

Day 1

May 2, 2017

Last night I headed down from Andover to Gloucester and got aboard the Roseway. It’s currently docked at the Gloucester Marine Railway. It was great getting reacquainted with the boat, and meeting all the crew. In fact, one of the crew members that was on my Ocean Classroom voyage, Cavo, is on the yard team. I had no idea he would be working on the ship and it was so nice to see him again.

Today I worked hard cleaning out bungs in the wood on the break of the deck. They proved incredibly hard to find, but with a mixture of intense sanding and scraping with a putty knife, I got them uncovered. I then used an awl to dig out the bungs to expose the screws, and then unscrewed them. I did all of this so we can take the wood at the break out so we can repair the caulking if necessary. Unfortunately, when unscrewing the screws, some of them got stripped, so I had to drill them out. I spent the rest of the day scraping up paint on the deck which proved to be rather difficult and ended up being much better tools than the ones I was using, but that’s okay. It’s exciting to get to know the boat better than I did before.



Work Log 10.5 Hours 7am-6pm, 30min Lunch Break
Total Hours: 10.5

Comments

Popular posts from this blog

Weekly Reflection 2

This week was another challenging week of working aboard the Roseway. I learned a lot from working with all of the smart hard working crew on board. One of my favorite things I’ve found while working on the Roseway is how quick and smart everyone is at fixing things. For example, Captain Tom was using a planer to take up some of the paint off of the deck. Unfortunately, he caught the cord in the planer, and got it stuck, so he had to cut it. Not even five minutes after the cord was caught, Captain Tom already had it spliced and back in action. Another time, I was working on sanding the bulwarks of the boat, and was using a combination of a five inch orbital sander, and a mini triangle sander. The triangle sander allowed me to get at the corners and edges a bit better. Unfortunately there were very few 60 grit pads for the triangle sander, so I told Captain that we needed more. Another crew member named Richie chimed in saying “You don’t need to get more pads, just cut the fi...

Weekly Reflection 1

May 7, 2017 This week was incredibly challenging, exciting, and surprising all at the same time. I headed down to Gloucester with no idea of what I would be doing all week with the Roseway Crew, or who the Roseway Crew even were. After this week I feel welcomed to the team, and have put in a lot of work in a very short amount of time. I didn’t realize that I would be spending so much time at only the break in the deck. Who know there were such intricacies to such a small part of the boat. It was incredible to be back on the Roseway, a boat I love dearly. While the work was hard and not fun at times, I kept on trucking through it because I know all the work I’m putting in is helping to maintain something that I love. I benefited from this week’s work in a few ways. First of all, I learned to work hard and persistently at something. It first seemed that my job was unimportant, but after I learned how it fit into the overall maintenance of the boat, I realized quickly that each part ...

Day 9

May 17, 2017 I got back on the boat for the last time. I'm only down here for two days 😟 Today was all hands on deck and we were hand sanding the places that the orbital sanders could get at. After finishing sanding the deck we got to priming it. When I started priming, I noticed I was blinking a lot and my eyes were watering, so I decided it was probably best to wear some eye protection. We put two coats of primer on today, and we should be able to paint tomorrow!